Work is underway on the T-22-07 highway on the section of km 37 + 000 -km 40 + 000
Ongoing work on the site includes:
- Swelling of the worn coating
- Arrangement of the base of gravel-sand mixture
- Regeneration of constructive layers of road clothes by the technology “cold recycling”
- Arrangement of a leveling layer from coarse-grained asphalt concrete
- The device of the top layer from SHCHMA
The works are being carried out according to the planned schedule