We continue to carry out fundamental works on the H-03 highway on the section Khmelnytskyi - Starokostiantyniv
We continue to carry out fundamental works on the H-03 highway on the section Khmelnytskyi – Starokostiantyniv
- The old Soviet-era pipe was dismantled
- A new corrugated metal culvert MultiPlate has been installed
- The pipe was wound with two layers of geotextile and a layer of compacted loam around the pipe
- The culvert was backfilled
- Arranged waterproof layer over the MGC of the geomembrane
- The two-layer protection of a geomembrane from geotextile (500 g / m²) is arranged
- Currently, we continue to compact the loam with rammers and soil rollers.